UTILITY SHUTDOWNS:
WORK AREAS:
Cornell Library
The books on the east side of the floor are being re-shelved within the library. The shelving on the east side of the floor will be dismantled and stored over the next two weeks. The library staff can assist in locating materials during this time.
The second floor of the library will be closed to the public during Spring Break. During that time, the study carrels on the east side of the floor will be moved to the west side, alongside the existing carrels. Then, a temporary full-height wall will be erected to separate the construction area from the rest of the library. The wall will provide weather protection and help control dust and noise during construction. The Library staff will retrieve books as needed from the floor during Spring Break. The second floor will reopen on Monday, March 18th and will remain open for the rest of the academic year.
While the library remains in operation on the west side of the temporary wall, construction will proceed on the east side. This work will continue through the rest of the spring semester and the summer. At the end of July, the penthouse will be complete and the temporary full-height wall will be removed. The book shelves will be reinstalled and the carrels will be put back in place to prepare for the new academic year.
Biology/ Commons Wing
Chiller Plant
PEDESTRIAN / VEHICULAR ACCESS:
NOISE, VIBRATION, DUST, ODORS
DELIVERIES / HEAVY EQUIPMENT:
Send message to the chair of the Science Project User's Group, Rachel Merz (rmerz1@swarthmore.edu)
For inquiries regarding construction issues, send message to construction@swarthmore.edu