Construction
Update as of January 2, 2002
Period 28 December 2001 - 9
January 2002
UTILITY SHUTDOWNS:
- There are no utility shut-downs planned for this period.
WORK AREAS:
Dupont Research Annex
- Temporary partitions throughout have been completed.
Rugby Field
- The new access road was paved with a base course of asphalt
and is open to traffic.
- Corrective work at the connection between the rugby lot and
the Dupont Visitors lot will be conducted during this
period, weather permitting.
Cornell Library
- Excavation and shoring at the south end of Cornell will
continue during the week of 7 January in preparation for building
foundation work that will start in mid-January.
Chiller Plant
- The building pad was cut and leveled during the week of
12/24.
PEDESTRIAN / VEHICULAR ACCESS:
- The new service drive alongside the Research Annex was paved
and re-opened to traffic.
- Parking along Whittier Place is prohibited during the hours of
7 a.m. to 5 p.m., Monday through Friday.
NOISE, VIBRATION, DUST, ODORS
- No significant disturbance is anticipated in the next two
weeks.
DELIVERIES / HEAVY EQUIPMENT:
- Expect delivery of shoring materials during the week of 7
January.
return to Home Page
Send message to the chair
of the Science Project User's Group, Rachel Merz
(rmerz1@swarthmore.edu)
For inquiries regarding construction issues, send message to
construction@swarthmore.edu
last updated 1/2/02
webmaster